INTRODUCTION

The Tulare Irrigation District Seaborn Reservoir Project is located on the Seaborn property in unincorporated Tulare County, approximately one mile southeast of the City of Woodlake. The Project area will go from the Seaborn Site and McKay’s Point, down through the watershed and encompass the service area of the Tulare Irrigation District (District) and the Consolidated Peoples Ditch Company (CPDC) boundaries. The Project area is located in the Kaweah Subbasin in the Tulare Lake Hydrogeologic Basin. The Kaweah River flows southwest from its headwaters in Sequoia National Park where it is impounded by the Terminus Dam forming Lake Kaweah. Once released from Lake Kaweah, flows from the Kaweah River continue past the Project area and drain into the ephemeral Tulare Lake in the southern end of the San Joaquin Valley, and by the St. John’s River which becomes Cross Creek, before draining into the Tulare Lake bottom near Corcoran.

PROJECT GOALS

The purpose of the Project is to protect groundwater supply and improve water flexibility and reliability in the Project Owners’ service area. There is currently an insufficient water supply for current and forecasted water demand during the peak irrigation season.

Protect ground water supply

Flood control capability

Maximize the usage of excess flow